This Aircraft has sold!
You missed out, but don't have to again! Subscribe to our eBroadcasts to stay in the loop.
2001 Piper Warrior III - N5319M
This is a low-cost, learn to fly platform! Perfectly upgraded panel with no money wasted on unnecessary features. 6,536 total time on the airframe with just under 2000 hours on the engine but that's in great condition.
Avionics include: Sandia Quatro Attitude Indicator, Garmin G5 Electronic HSI, Avidyne IFD-440 Com / Nav / GPS, and Garmin GMA-340 Audio Panel.
Avionics include: Sandia Quatro Attitude Indicator, Garmin G5 Electronic HSI, Avidyne IFD-440 Com / Nav / GPS, and Garmin GMA-340 Audio Panel.
Logbook Downloads:
(Better than new!)
These are not ALL the logbooks, but it's the big stuff. Have a read through and let us know if you have any questions. |
Located in: Summerville, SC (KDYB) |
Airframe
Serial: 2842122
Total Time: 6,536.8
Total Time: 6,536.8
Engine
Lycoming 0-320-D3G
Serial Number: L-11080-39A
Total Time: 6,076.9
SMOH: 1,999.5 (4/30/09)
Serial Number: L-11080-39A
Total Time: 6,076.9
SMOH: 1,999.5 (4/30/09)
Propeller
Sensenich 74DM6060
Serial Number: A60821
Total Time: 4259.2
Serial Number: A60821
Total Time: 4259.2
Avionics
- Garmin G5 HSI
- Sandia Quatro Attitude Indicator
- Garmin GMA-340 Audio Panel
- Avidyne IFD-440 GPS w/ Traffic and Terrain
- GTX-330ES Transponder with ADSB out
- Artex 406 ELT
- Garmin 106-A Glide Slope Indicator
- Garmin SL-40 Secondary Comm
Additional Features
- Wheelen LED Landing Light
- 2 Speed Blower Fan
- Skytec Starter
Aircraft Maintenance / History
- Annual Inspection last complied with in July 2022, due July 30th, 2023.
- 91.411 / 91.413 Inspections last complied with July 2022, due June 31st, 2024.
- Wingspar AD complied with 2021
Previously used as a professional flight training aircraft and based in Arizona.
In August of 2004 at Hobbs Time 1,575, the Aircraft was substantially damaged in a windstorm where another aircraft overturned and hit this Aircraft. The Aircraft was sent to Beegles Aircraft in Greely, CO a well know, heavy repair facility and rebuilt using mostly full part replacements under Work Order 9865. Repairs are well-documented and the Work Order is available for review upon request.